Advertisement

Ad promo image large
  • Published Date

    April 25, 2021
    This ad was originally published on this date and may contain an offer that is no longer valid. To learn more about this business and its most recent offers, click here.

Ad Text

ADVERTISEMENT FOR BIDS PROJECT: ABATEMENT & DEMOLITION of KENAMOND HALL & TURNER HALL SHEPHERD UNIVERSITY SHEPHERDSTOWN, WV 25443 This project consists of abatement and complete demolition of Kenamond Hall and Turner Hall located off North King Highway at Shepherd University in Shepherdstown, WV. Kenamond Hall is a 3-story, 30,000 square foot, masonry construction, 131 room, residence hall. Turner Hall is a 3-story, 35,000 square foot, ma- sonry construction, 126 room, residence hall. Scope of work will include cutting and capping of all utilities at nearest manhole, removal of utilities from caping point throughout the building including excavation and post removal backfill. Scope will also include removal of all existing building foundations, post removal backfill, and temporary erosion and sediment control measures as necessary. Bids shall include furnishing dumpsters for, trans- portation of, and proper disposal of abatement and demolition debris. The bid documents, communication, and bid submission will be handled through Building Connected. All bidders will be required to submit pre-qualification information, including 3 past projects with abatement and demolition of multi-story masonry building of comparable size. A mandatory pre-bid meeting will be held via Zoom on Monday, 5/3/2021 at 10:00 a.m. Interested contractors need to request access and pre-bid information by sending an email to estimating@marchwestin.com. ADVERTISEMENT FOR BIDS PROJECT: ABATEMENT & DEMOLITION of KENAMOND HALL & TURNER HALL SHEPHERD UNIVERSITY SHEPHERDSTOWN, WV 25443 This project consists of abatement and complete demolition of Kenamond Hall and Turner Hall located off North King Highway at Shepherd University in Shepherdstown, WV. Kenamond Hall is a 3-story, 30,000 square foot, masonry construction, 131 room, residence hall. Turner Hall is a 3-story, 35,000 square foot, ma- sonry construction, 126 room, residence hall. Scope of work will include cutting and capping of all utilities at nearest manhole, removal of utilities from caping point throughout the building including excavation and post removal backfill. Scope will also include removal of all existing building foundations, post removal backfill, and temporary erosion and sediment control measures as necessary. Bids shall include furnishing dumpsters for, trans- portation of, and proper disposal of abatement and demolition debris. The bid documents, communication, and bid submission will be handled through Building Connected. All bidders will be required to submit pre-qualification information, including 3 past projects with abatement and demolition of multi-story masonry building of comparable size. A mandatory pre-bid meeting will be held via Zoom on Monday, 5/3/2021 at 10:00 a.m. Interested contractors need to request access and pre-bid information by sending an email to estimating@marchwestin.com.